Worldwide, Jenbacher has supplied more than 25,000 engines with a total output of more than 37 GW. In the U.S. and Canada, there are more than 1,000 engines installed at over 850 sites, with a total power output of more than 1.7 GW. Learn more about some of our projects with Jenbacher gas engines in North America.
- El Gabar Al Asfar Wastewater Treatment Plant (EGY)EgyptAfrica
El Gabar Al Asfar Wastewater Treatment Plant (EGY)
EL GABAL AL ASFAR SEWAGE GAS PLANT
boosts power and cuts costs at one of Egypt’s largest wastewater treatment facilitiesLocation
Cairo, Egypt
Installed engines
6 x J616
Electrical output
14.6 MW
Thermal output
7.5 MW
Total efficiency
65.9%
Energy source
Sewage gas
Commissioned
2024
- CN Paper Mill (CHN)China – MainlandChina
CN Paper Mill (CHN)
USING WASTEWATER SEWAGE GAS TO PROVIDE ELECTRICITY AND HEAT FOR PAPER MILL IN CHINA
Solution reduces costs while converting waste to energyLocation
China
Installed engines
3 x J616
Electrical output
8.028 MW
Thermal output
7.562 MW
Energy source
Sewage gas
Commissioned
2023
- La Cira (COL)ColombiaLatin America
La Cira (COL)
TURNING FLARE GAS INTO POWER
for lower energy costs, greater reliability, and reduced emissionsLocation
La Cira, Colombia
Installed engines
11 x J420
Electrical output
14.6 MW
Electrical efficiency
40.8%
Energy source
Flare gas
Commissioned
2016, 2022
- Mavrorachi Landfill (GRC)GreeceEEA and Switzerland
Mavrorachi Landfill (GRC)
USING LANDFILL GAS FOR POWER GENERATION TO LOWER GREENHOUSE GAS EMISSIONS
Sustainable HELECTOR project with Jenbacher engines in Greece wins global environmental awardLocation
Thessaloniki, Greece
Installed engines
3 x J416
Electrical output
3.52 MW
Electrical efficiency
42%
Energy source
Landfill gas
Commissioned
2020
- Agrotor (HND)HondurasLatin America
Agrotor (HND)
HONDURAN EDIBLE VEGETABLE OIL EXTRACTION PLANT
uses waste byproduct for power generationLocation
San Alejo, Atlantida, Honduras
Installed engines
1 x J420, 1 x J316
Electrical output
2,272 kW
Total efficiency
up to 40.1%
Energy source
Biogas
Commissioned
2019, 2008
- Stralsund (GER)GermanyEEA and Switzerland
Stralsund (GER)
INNOVATIVE PLANT OPERATION
Thinking beyond iCHPLocation
Stralsund, Germany
Installed engines
2 x J624
Electrical output
9 MW
Thermal output
9,5 MW (CHP plant) 2,1 MW (heat pump)
Energy source
Pipeline gas
Commissioned
2023
- Yukon (CAN)CanadaNorth America
Yukon (CAN)
LNG-TO-POWER ADDS STABILITY TO ISOLATED GRID
delivering lower cost, lower emission power to balance renewable energyLocation
Yukon, Canada
Installed engines
3 x J624
Electrical output
13.2 MW
Thermal output
7.5 MW
Energy source
LNG
Commissioned
2015
- Biotown (USA)United StatesNorth America
Biotown (USA)
SUPPORTING THE CONVERSION OF WASTE
to power and heat from RNG/biomethaneLocation
Indiana, USA
Installed engines
1 x J420, 6 x J320
Electrical output
1,429 kW; 6,357 kW
Thermal output
5,388 MBTU/hr; 12,751 MBTU/hr (hot water)
Total efficiency
85.2%
Energy source
Biogas
Commissioned
2011, 2014, 2020, 2023
- Den Berk Délice (BEL)BelgiumEEA and Switzerland
Den Berk Délice (BEL)
FUELING GREENHOUSE OPERATIONS
with combined heat and powerLocation
Den Berk Délice, Belgium
Installed engines
6 x J416, 2 x J624
Electrical output
16,482 kW
Thermal output
20,948 kW
Total efficiency
102.3% (44.5% electricity, 57.8% heat)
Energy source
Pipeline gas
Commissioned
2017, 2022
- Klostermansfeld (GER)GermanyEEA and Switzerland
Klostermansfeld (GER)
GREATER FLEXIBILITY
for regional renewablesLocation
Klostermansfeld, Germany
Installed engines
1 x J316, 1 x J612
Electrical output
2.83 MW
Thermal output
2.67 MW
Energy source
Biogas
Commissioned
2009, 2020
- Del Monte (PHL)PhilippinesAsia/Pacific
Del Monte (PHL)
TURNING WASTE INTO ENERGY AT A FRUIT CANNERY
Jenbacher engines power 1st combined heat and power plant to run on biogas in the PhilippinesLocation
Del Monte, Philippines
Installed engines
2 x J420, 1 x J320
Electrical output
3.88 MW
Thermal output
3.19 MW
Total efficiency
up to 85%
Energy source
Biogas
Commissioned
2015, 2019
- Memmingen Airport (GER)GermanyEEA and Switzerland
Memmingen Airport (GER)
RELYING ON REGIONAL BIOGAS
to achieve a climate-neutral airportLocation
Memmingen, Deutschland
Installed engine
1 x J420
Electrical output
1.5 MW
Thermal output
1.7 MW
Energy source
Biogas
Commissioned
2023
- Dentis (ITA)ItalyEEA and Switzerland
Dentis (ITA)
STABLE, EFFICIENT POWER FOR THE ITALIAN PLASTIC RECYCLING INDUSTRY
with Jenbacher CHP technologyLocation
Sant' Albano Stura, Italy
Installed engines
2 x J624
Energy source
Pipeline gas
Thermal output
Thermal hot water 90°C: 5.2 MW, thermal steam 11 bar: 2.8 MW
Electrical output
8.8 MW
Total efficiency
84%
Commissioned
2022
- Syncraft Frauenfeld (SUI)SwitzerlandEEA and Switzerland
Syncraft Frauenfeld (SUI)
INNOVATIVE WOOD CHP PLANT
using Jenbacher technologyLocation
Frauenfeld, Switzerland
Installed engines
4 x J420
Electrical output
4 MW
Thermal output
14 MW
Energy source
Wood gas
Commissioned
2022
- Concord Adela (MYS)MalaysiaAsia/Pacific
Concord Adela (MYS)
POWERING JENBACHER ENGINES WITH BIOGAS MADE FROM PALM OIL BYPRODUCT IN MALAYSIA
Award-winning plant supports the country's net-zero emissions effortsLocation
Johor, Malaysia
Installed engines
2 x J412
Energy source
Biogas
Electrical output
1,800 kW
Electrical efficiency
42.6%
Commissioned
2019
- GAMOR Saarbrücken (GER)GermanyEEA and Switzerland
GAMOR Saarbrücken (GER)
MODERN POWER PLANT FOR THE FUTURE
Environmentally friendly heat and electricity from SaarbrückenLocation
Saarbrücken, Germany
Installed engines
5 x J920 FleXtra
Electrical output
53 MW
Thermal output
52,5 MW
Energy source
Pipeline gas
Commissioned
2022
- AMCO Produce (CAN)CanadaNorth America
AMCO Produce (CAN)
COMBINED HEAT AND POWER SYSTEM FULLY POWERS GREENHOUSE OPERATIONS
Efficient, cost-effective CHP plant supports energy- and heat- intensive hydroponic production while delivering a reduced carbon footprintLocation
Ontario, Canada
Installed engine
1 x J316
Electrical output
850 kW
Thermal output
1.2 MW
Total efficiency
90%
Energy source
Pipeline gas
Commissioned
2021
- International Airport Pennsylvania (USA)United StatesNorth America
International Airport Pennsylvania (USA)
INTEGRATING A MICROGRID WITH SOLAR POWER FOR ENERGY SELF-SUFFICIENCY
A U.S. airport is making history as the 1st in the country to get 100% of its power from a microgridLocation
Pennsylvania, U.S
Installed engines
5 x J624
Electrical output
21.8 MW
Electrical efficiency
44.7%
Energy source
Pipeline gas
Commissioned
2021
- Permoda Plants (COL)ColombiaLatin America
Permoda Plants (COL)
BOOSTING ENERGY RELIABILITY AND EFFICIENCY
With heat and power for the textile industry that meets stringent local emissions requirements at high altitudesLocation
Permoda, Colombia
Installed engines
2 x J208, 2 x J312, 2 x J320
Electrical output
3.5 MW
Thermal output
2.1 MW
Total efficiency
>80%
Energy source
Pipeline gas
Commissioned
2017, 2019, 2021 and 2022
- K&C Valley (IND)IndiaIndia
K&C Valley (IND)
DELIVERING ENERGY SELF-SUFFICIENCY WITH REDUCED EMISSIONS
Combined heat and power plant harnesses sewage gas to generate greener power in IndiaLocation
Bangalore, India
Installed engine
1 x J320
Electrical output
1,067 kW
Thermal output
1,150 kW
Total efficiency
83.5%
Energy source
Sewage gas
Commissioned
2018
- B.E.N.E. Möglingen (GER)GermanyEEA and Switzerland
B.E.N.E. Möglingen (GER)
PROVIDING HEAT WITH A SUSTAINABLE, INNOVATIVE ENERGY CONCEPT
Initiative combines Jenbacher CHP technology with a solar installation and heat exchangerLocation
Möglingen, Germany
Installed engine
1 x J320
Electrical output
999 kW
Thermal output
1,384 kW
Energy source
Pipeline gas
Commissioned
2021
- Biomont Landfill Plant (CAN)CanadaNorth America
Biomont Landfill Plant (CAN)
LANDFILL GAS-TO-ENERGY
Biomont Énergie plant converts landfill gas into energy, significantly reducing emissions in MontréalLocation
Montreal, Canada
Installed engines
3 x J612
Electrical output
4.8 MW
Thermal output
5.2 MW
Total efficiency
85%
Energy source
Landfill gas
Commissioned
2017
- Shanghai International Tourism and Resort Zone (CHN)China – MainlandChina
Shanghai International Tourism and Resort Zone (CHN)
Jenbacher J624 trigeneration technology for efficient and clean energy to resort complex in Shanghai
Location
Shanghai, China
Installed engines
5 x J624
Electrical output
22 MW
Electrical efficiency
45.4%
Total efficiency
~88%
Energy source
Pipeline gas
Commissioned
2014
- Huadian Industrial Park (CHN)China – MainlandChina
Huadian Industrial Park (CHN)
Jenbacher J620 gas engines provide reliable, efficient energy to industrial park in Beijing
Location
Beijing, China
Installed engines
2 x J620
Electrical output
6.7 MW
Total efficiency
~87%
Energy source
Pipeline gas
Commissioned
2014
- Hansewerk Natur (GER)GermanyEEA and Switzerland
Hansewerk Natur (GER)
FLAGSHIP HYDROGEN PROJECT
using Jenbacher technologyLocation
Hamburg, Germany
Installed engines
1 x J416
Electrical output
600 kW
Thermal output
1 MW
Energy source
100% Hydrogen
Commissioned
2019 (pipeline gas), 2022 (hydrogen)
- Gasgreen Energia (ECU)EcuadorLatin America
Gasgreen Energia (ECU)
TURNING LANDFILL GAS INTO CLEAN ELECTRICITY
Innovative biogas power plant is reducing methane gas pollution in EcuadorLocation
Quito, Ecuador
Installed engines
2 x J320, 3 x J420
Electrical output
up to 5 MW
Total efficiency
39.6%
Energy source
Landfill gas
Commissioned
2016, 2017
- Chengdu Chang’an (CHN)China – MainlandChina
Chengdu Chang’an (CHN)
LANDFILL GAS POWER GENERATION PROJECT
Delivers renewable, low-emission power and wins praiseLocation
Chengdu, China
Installed engines
20 x J420
Electrical output
29.7 MW
Total efficiency
41.7%
Energy source
Landfill gas
Commissioned
2017, 2018
- Barts NHS Hospital (GBR)United KingdomEurope (excl. EEA, Switzerland)
Barts NHS Hospital (GBR)
Jenbacher J420 trigeneration technology plays a lead role in increasing energy security and reducing emissions
Location
London, United Kingdom
Installed engine
1 x J420
Electrical output
1.4 MW
Thermal output
1.6 MW
Energy source
Pipeline gas
Commissioned
2015
- Istanbul Enerji (TUR)TurkeyEurope (excl. EEA, Switzerland)
Istanbul Enerji (TUR)
RENEWABLY POWERING EUROPE’S LARGEST CITY
Biomass plant in Turkey advances environmental objectives while providing 37 MW of electricity to IstanbulLocation
Istanbul, Turkey
Installed engines
26 x J420
Electrical output
36.4 MW
Electrical efficiency
41.3%
Energy source
Landfill gas
Commissioned
2021, 2022
- AGR Fenland Glasshouse (GBR)United KingdomEurope (excl. EEA, Switzerland)
AGR Fenland Glasshouse (GBR)
DELIVERING LOW-CARBON POWER AT UK GREENHOUSE
CHP energy center with an innovative heat pump system delivers power and heat with 30% less CO2 than conventionally heated greenhousesLocation
Cambridgeshire, United Kingdom
Installed engines
1 x J416, 1 x J620, 1 x J624
Electrical output
9 MW
Thermal output
11.2 MW
Total efficiency
101.76%
Energy source
Pipeline gas
Commissioned
2022
- Chengzhuang CBM (CHN)China – MainlandChina
Chengzhuang CBM (CHN)
DELIVERING EFFICIENT, GREENER POWER
through coalbed methane power generationLocation
China
Installed engines
12 x J620
Electrical output
40.5 MW
Thermal output
36 MW
Total efficiency
80%
Energy source
Coalbed methane (CBM)
Commissioned
2017
- PT Grand Indonesia (IDN)IndonesiaAsia/Pacific
PT Grand Indonesia (IDN)
Jenbacher J620 gas engines provide half of peak load power for Grand Indonesia Shopping Town
Location
Jakarta, Indonesia
Installed engines
6 x J620
Electrical output
16.2 MW
Electrical efficiency
42.1%
Energy source
Pipeline gas
Commissioned
2007
- Milchwerke Oberfranken (GER)GermanyEEA and Switzerland
Milchwerke Oberfranken (GER)
FLEXIBLE POWER SOLUTION
for the dairy sectorLocation
Wiesenfeld, Germany
Installed engine
1 x J612
Electrical output
2 MW
Thermal output
1.8 MW
Total efficiency
86%
Energy source
Pipeline gas
Commissioned
2019
- Dominikus-Ringeisen-Werk (GER)GermanyEEA and Switzerland
Dominikus-Ringeisen-Werk (GER)
NEXT-GENERATION 3F ENGINE PLATFORM
Fit for the future—thanks to more than 20 years of technical collaborationLocation
Ursberg, Germany
Installed engines
3 x J312 (F)
Electrical output
1.6 MW
Thermal ouput
2 MW
Energy source
Pipeline gas
Commissioned (3B version)
1999/2000 (Upgrade: 2013 - 3C version, 2021/22 - 3F version)
- CNCity Energy, Hakha region (KOR)Korea, Democratic People's Republic of
CNCity Energy, Hakha region (KOR)
JENBACHER J624 GAS ENGINES
to support high efficiency combined heat and power in South KoreaLocation
Daejeon, Hakha region, South Korea
Installed engines
6 x J624
Electrical output
25,182 kW
Thermal output
24,600 kW
Total efficiency
87%
Energy source
Pipeline gas
Commissioned
2011-2015
- Changsha Happy City (CHN)China – MainlandChina
Changsha Happy City (CHN)
POWER, HEAT, AND COOLING PROJECT
supports the energy transition in ChinaLocation
Changsha, China
Installed engines
2 x J320
Electrical output
2 MW
Total efficiency
>80%
Energy source
Pipeline gas
Commissioned
2019
- Wangdee Biogas Power Plant (THA)ThailandAsia/Pacific
Wangdee Biogas Power Plant (THA)
TURNING WASTE INTO POWER AT TAPIOCA STARCH PLANT
Biogas plant delivers 4.27 MW of costeffective power while also solving the facility’s waste management issuesLocation
Kamphaeng Phet province, Thailand
Installed engines
4 x J320
Electrical output
4.27 MW
Electrical efficiency
40.2%
Energy source
Biogas
Commissioned
2015, 2021, 2023
- Hefei Xiaomiao (CHN)China – MainlandChina
Hefei Xiaomiao (CHN)
CONVERTING WASTE TO RENEWABLE ENERGY IN CHINA
The new organic waste treatment center in Hefei City relies on two Jenbacher J420 gensets to turn kitchen waste into green powerLocation
Hefei City, Anhui Province, China
Installed engines
2 x J420
Electrical output
3 MW
Total efficiency
85%
Energy source
Biogas
Commissioned
2021
- Shanxi Jinju Hudi (CHN)China – MainlandChina
Shanxi Jinju Hudi (CHN)
LOW CONCENTRATION MINE METHANE DISTRIBUTED POWER PROJECT
supporting China’s energy transitionLocation
Jincheng City, Shanxi Province, China
Installed engines
8 x J420
Electrical output
10 MW
Thermal output
10.5 MW
Total efficiency
80%
Energy source
LCMM gas
Commissioned
2019
- Vodafone (ITA)ItalyEEA and Switzerland
Vodafone (ITA)
Jenbacher trigeneration plant provides efficient cooling, heat and power to Italian emergency system
Location
Milan, Italy
Installed engine
1 x J620
Electrical output
3,354 kW
Thermal output
3,385 kW
Total efficiency
>88%
Energy source
Pipeline gas
Commissioned
2012
- Datacenter Beijing (CHN)China – MainlandChina
Datacenter Beijing (CHN)
One of Chinaʼs first data center to use trigeneration as main source for power, heat and cooling
Location
Beijing, China
Installed engines
5 x J620
Electrical output
16.7 MW
Thermal output
16.7 MW
Total efficiency
>88%
Energy source
Pipeline gas
Commissioned
2014
- Chok Yuen Yong (THA)ThailandAsia/Pacific
Chok Yuen Yong (THA)
JENBACHER J420 GAS ENGINES RUN ON BIOGAS
to deliver innovative cogeneration solution for Thai tapioca starch production facilityLocation
Kham Thale So District, Nakhon Ratchasima, Thailand
Installed engines
5 x J420
Electrical output
7,105 kW
Electrical efficiency
42%
Energy source
Biogas
Commissioned
2012
- Heslerhof (GER)GermanyEEA and Switzerland
Heslerhof (GER)
FLEXIBLE BIOGAS PLANTS
with Jenbacher cogeneration technologyLocation
Allgau region, Germany
Installed engine
1 x J420
Electrical output
1,562 kW
Thermal output
1,760 kW
Total efficiency
90.1%
Energy source
Biogas
Commissioned
2021
- Acea Produzione SpA (ITA)ItalyEEA and Switzerland
Acea Produzione SpA (ITA)
J920 FLEXTRA ENGINES DELIVER ENHANCED FLEXIBILITY
greater efficiency, and lower emissionsLocation
Rome, Italy
Installed engines
3 x J920 FleXtra
Electrical output
28.5 MW
Thermal output
21.9 MW
Total efficiency
>80 %
Commissioned
2017, 2020
- Fernwärme Ulm GmbH (GER)GermanyEEA and Switzerland
Fernwärme Ulm GmbH (GER)
INNIO ACCELERATES HEAT TRANSITION
Ulm completes its coal phaseout, thanks to two Jenbacher J920 FleXtra cogeneration plantsLocation
Ulm, Germany
Installed engines
2 x J920 FleXtra
Electrical power
2 X 10 MW
Thermal output
2 x 9,6 MW
Electrical efficiency
48,8%1
Energy source
Pipeline gas
Commissioned
2022
- J920 FleXtra in Stapelfeld Schleswig-Holstein (GER)GermanyEEA and Switzerland
J920 FleXtra in Stapelfeld Schleswig-Holstein (GER)
J920 FleXtra, centerpiece of the largest cogeneration plant in North Germany
Location
Stapelfeld, Germany
Installed engines
1 x J920 FleXtra
Power output
9.513 kW
Thermal output
~ 10.000 kW
Total efficiency
> 95%
Commissioned
2015
- Muddy Creek Wastewater Treatment Plant (USA)United StatesNorth America
Muddy Creek Wastewater Treatment Plant (USA)
COMBINED HEAT AND POWER FACILITY
helps wastewater treatment plant increase efficiency, reduce power costs, meet environmental complianceLocation
Winston-Salem, North Carolina, USA
Installed engine
1 x J416
Electrical output
1,137 kW
Thermal output
805 kW
Energy source
Sewage gas
Commissioned
2020
- Stadtwerke Bad Säckingen (GER)GermanyEEA and Switzerland
Stadtwerke Bad Säckingen (GER)
NEW GENERATION
Jenbacher J420 E driving the energy transformation forwardLocation
Säckingen, Germany
Installed engines
1 x J312, 2 x J416, 2 x J420 E
Electrical output
5.7 MW
Thermal output
6.2 MW
Energy source
Biomethane
Commissioned
2012, expanded: 2020